Skip To Content
- Blog -
Topic Search

Getting Ready for the Keel Laying of Nieuw Amsterdam

Last week the large section of Nieuw Amsterdam that was built at Fincantieri’s Sestri yard near Genoa, Italy, was towed around the foot of Italy to our yard here in Venice. Once it arrived, the section was floated into the building dock and later in the week put on the blocks.

The section that signifies the keel laying ceremony will be lifted into the building dock and later joined with the section built in Sestri that already is in the building dock.

na_keel6

na_keel1

na_keel2

na_keel5

Here are some more pictures after the section was put on the blocks and the dock was pumped dry. Please note that the large tank on the aft of the ship was used to level the section before it could be put on to the blocks.

na_keel7

na_keel8

Pieter Rijkaart is the director of newbuilds for Holland America Line.

7 Comments
  • InTheWASide

    What is the ship in the background of the first image? Is that one of Costa’s newbuilds?

  • Maasdam

    Thank you Roland fore you’re prompt response after my mail. These are interesting pictures. Is there a new approach in building by Fincantiëre. As far I know the Eurodam was build completely at the Venice yard. It feels good to see the name Nieuw Amsterdam on a bow again.

    Thanks fore the update.
    Greetings from the home port Rotterdam
    Ben.

  • Julie

    That is the Costa Luminosa. It will be delivered April 30.

  • viajarencruceros

    beautiful cruise 🙂

    best regards,
    cruceros

  • sesjo

    Nice to see the name Nieuw Amsterdam again.
    Pitty the old one is scrapted

Leave a Reply

Your email address will not be published. Required fields are marked *

*