Home
>
Archived
>
Repaired Azipod Installed on Oosterdam

Repaired Azipod Installed on Oosterdam

Wiel Penders from Holland America Line’s technical operations department sent us these photos of Oosterdam receiving it’s repaired Azipod today.

oo_azipod21 oo_azipod22
The repaired Azipod is lowered to the dock floor.

oo_azipod23
The spare Azipod is lowered from Oosterdam.

oo_azipod24 oo_azipod25
The spare Azipod is pushed away across the guide rails by a forklift.

oo_azipod26
The repaired and spare Azipods side by side on the dock floor.

oo_azipod27
The repaired Azipod is loaded onto the guide rails, ready to be pushed into place and attached.

Comments

Join the Discussion

Leave A Comment

Related Articles